|
|
Engine of the Month Toyota 22RE, 84 1/2 - 95 |
||
![]() |
![]() |
|
![]() |
![]() |
|
|
LIST OF NEW PARTS INSTALLED IN THESE ENGINES ARE 1-NEW PISTONS AND RINGS 2-NEW ROD BEARINGS 3-NEW MAIN BEARINGS 4- NEW PIN BUSHINGS 5-NEW H.D. TIMING CHAIN SET STEEL RUB RAILS 6-NEW TIMING COVER 7-NEW OIL PUMP 8-NEW THRUST BEARINGS 9-NEW HEAD BOLTS 10-FEL PRO GASKET SET ( INCLUDED ALL GASKETS NEEDED TO INSTALL ENGINE) 11-FEL PRO REAR MAIN SEAL 12-NEW VALVE SPRINGS 13-NEW VALVE GUIDES AND VITON SEALS 14-NEW DELTA CAMSHAFT WE OFFER RV CAM FOR EXTRA FEE. 15- NEW SOFT PLUGS AND OIL GALLEY PLUGS INSTALLED IN BLOCK 16- REMAN ROCKER ARM ASSY.
MACHINING PROCESS PERFORMED ON ENGINE. 1-ENGINE AND HEAD IS CLEANED ALL BOLT HOLES CHECKED AND REPAIRED 2- SURFACES ARE CHECKED AND MILLED IF NEEDED 3-BLOCKS ARE BORED AND HONED 4-RODS RECONDITIONED AND PIN BUSHING INSTALLED NEW 5-CRANK SHAFT IS GROUND AND POLISHED 6-CYLINDER HEAD IS PRESSURE TESTED CAM LINE CHECKED ALL BOLT HOLES TAPED AND REPAIRED IF NEEDED WE CHECK THE THICKNESS OF THE HEADS ALL WITHIN THE FACTORY SPECKS, HEADS 3-ANGEL CUT ON A SERDI MACHINE AND MILLED WITH A CBN MILL ALL OUR EQUIPMENT STATE OF THE ART. 7- VALVES WILL BE ADJUSTED AND ENGINE WILL BE SET ON T.D.C. #1 8- TIMING COVERS ARE INSTALLED ON BARE BLOCK AND MILLED WITH THE DECK TO INSURE A PERFECT FIT. SEE PHOTO OF 3-ENGINES ON STAND. 9- NEW OIL PUMP WILL BE INSTALLED AND PRIMED.
Also available....
|
||
|